The clean up

It’s a big job, but the clean-up has already started with 18,000 cubic metres of earth excavated from the site of the new road and the Waterside zones (by the River Colne) for material and chemical decontamination. This is equivalent to 7 Olympic sized swimming pools.

Have your say